skip to main content

Selling Power to the Utility

CBRE LMI RFP Documents

Below is the Draft LMI CBRE RFP as part of the 8/25/2021 Filing:

Document Redline
Exhibit 1: Description of Development of Revisions
Rule 29: Hawaiian Electric
Rule 29: Maui Electric
Rule 29: Hawaii Electric Light
(Redline Hawaiian Electric)
(Redline Maui Electric)
(Redline Hawaii Electric Light)
RFP: Main Body (Redline)
Appendix A: Definitions (Redline)
Appendix B: Proposer’s Response Package/ Project Interconnection Data Request (Redline Body)
(Redline Attachment 3)
(Redline Attachment 6)
Appendix C: Code of Conduct Procedures Manual
Appendix D: PowerAdvocate User Information
Appendix E: Mutual Confidentiality and Non-Disclosure Agreement
Appendix F: Description of Available Sites
Appendix G: Reserved
Appendix H: Interconnection Facilities Cost and Schedule Information (Redline Body)
(Redline Attachment 5)
Appendix I: Grid Needs Assessment (Redline)
Appendix J: Rule 29 Tariff - Hawaiian Electric
Appendix J: Rule 29 Tariff - Maui Electric
Appendix J: Rule 29 Tariff - Hawaii Electric Light
See Rule 29 for Redlines
Appendix K: Model PV Mid-Tier Standard Form Contract (SFC) RDG PPA (Roadmap and Redlines)
Appendix K-1: Project Specific Addendum for the Mid-Tier Standard Form Contract (Oahu)
Appendix K-2: Project Specific Addendum for the Mid-Tier Standard Form Contract (Maui and Hawaii Island)
Appendix K-5: Attachment DCC to the Project Specific Addendum for Mid-Tier Standard Form
Appendix L: Model PV Large RDG PPA (Roadmap and Redlines)
Appendix L-1: Project Specific Addendum for the RDG PPA (Oahu)
Appendix L-2: Project Specific Addendum for the RDG PPA (Maui and Hawaii Island)
Appendix L-4: Attachment DCC to the Project Specific Addendum for RDG PPA: DC Coupled Storage